Stimulation Triplex Pump

Refurbishment and Re-engineering

Italy

Complete refurbishment of a triplex unit: total overhaul and new DNV 2.7-1 skid, with ATEX adaptation and CE-PED certification.

Context

Complete refurbishment and re-engineering intervention of a triplex pumping unit with total overhaul of the engine, pump, and transmission.

Requalification of auxiliary circuits, design and construction of a new lifting skid compliant with the DNV 2.7-1 directive for offshore use. Adaptation for use in classified zones and issuance of CE-PED certification.

The project involved a complete refurbishment and re-engineering intervention of a high-pressure (10K psi) triplex pumping unit, with the goal of restoring its operational performance and adapting it to the latest regulatory and safety standards for offshore applications.

DSC 5895 2 1
DSC 5911 2

Activities

The intervention allowed extending the unit’s lifecycle, improving its operational reliability, and ensuring its full compliance with international standards applicable to the Offshore Oil & Gas sector.

  • Total refurbishment of main mechanical components: engine, pump, and transmission system
  • Overhaul and requalification of all auxiliary circuits
  • Structural re-engineering and design of a new lifting skid
  • Construction of the skid in compliance with the DNV 2.7-1 directive for offshore use
  • Adaptation of the unit for use in a classified zone
  • Issuance of CE-PED adaptation certification