The 20-foot Half Height Offshore Basket is engineered and certified in accordance with DNV 2.7-1 / EN 12079 standards for offshore containers. Designed for safe and efficient transport of equipment and materials in offshore environments, it features a side opening configuration to enable easy loading and unloading of cargo, particularly long or awkward items.
manufacturing date, by LR or unless noted otherwise External Dimensions 19″ – 10 1/2 (6058) / 8″ (2438) Internl cubic capacity 12,2 m3 Stacking Test Load for CSC 96012 Kg Sling Angle 45° EN 10219 S275 J2H, or higher, on primary structure EN10025 S355K2+N, (Impact Energy of 36 J min AVE @ -40°C), Inspection Certificate EN10204:2004 Type 3.2 on padeyes EN 10219 S235 JR on secondary structure Lashing Point 46
Specifications:
Description: 20′ Half Height DNV271 with side open
Manufacturer: OEG
Approvals: Certified to DNV 2.7-1 and ISO 10855 subject to
Tare Weight: 2570 Kg
Max Gross Weight: 12570 Kg
Max: Payload 10000 Kg
Frame: Design Temperature -20 Deg C to +70C Deg C
Material: EN 10025-2
Sector: Refurbishment and Re-engineering
Country: Italy
Complete refurbishment and re-engineering of a high-pressure triplex pumping unit, with a total overhaul of the engine, pump, and transmission. New DNV 2.7-1 compliant skid, ATEX adaptation for classified zones, and CE-PED certification for offshore applications.
Sector: Geothermal
Country: Netherlands
Supply of Koomey Unit and Pressure Control Equipment, including large-sized Quick Test Subs and Crossovers (13 5/8″ and 12″), for workover and coiled tubing activities on a geothermal well in the Netherlands. The solutions were designed to allow the passage of workover assemblies and jet pumps with an OD up to 9″, ensuring operational continuity, safety, and documentation compliant with project requirements, supporting the development of geothermal energy as a renewable source.
Sector: Production Enhancement – Chemical Supply
Country: Kazakhstan
Joint development and supply of custom-made chemical formulations, in collaboration with the Client, for production enhancement and plant performance optimization applications. The program allowed an improvement in process efficiency and a significant reduction in operating costs.
Sector: Workover
Country: Turkmenistan
Supply of 15K PSI Well Control Equipment for a client operating in Turkmenistan. The equipment was prepared, tested, and certified in accordance with the operator’s technical requirements for use in a field characterized by complex operating conditions. The technical support provided during alignment and scope definition meetings was crucial for the correct configuration of the solutions.
Sector: Workover
Country: Turkey
Supply of Coflex Hose for a well testing project in Turkey. Technical specifications were defined in close coordination with the Client to ensure full compliance with the operator’s operational standards and QA/QC procedures. The added value of the intervention was direct field support, with operational verification and technical alignment during installation activities.
Send a request with activity, country, and timelines:
we will verify feasibility and required documentation.