TANK FOR DIESEL FUEL STORAGE 4950 LT

Tank manufactured from first-choice carbon steel S235JR in accordance with EN10025/93, thickness 3.0 mm, with a horizontal cylindrical axis on support saddles. 400 mm diameter manway with bolts and gasket; lockable 3″ filling connection; 90% overfill prevention valve; 1″1/2 vent with flame-arrester mesh; mechanical dial-type level gauge. In the lower part of the tank there is a drain plug for scheduled periodic cleaning.

The suction pipe is raised to allow proper diesel settling, and is fitted with a check valve and filter. The tank is pre-treated with two coats of epoxy primer and subsequently painted with two coats of glossy two-component polyurethane topcoat.

Technical details

Certifications:
– Approved by the Italian Ministry of the Interior in accordance with Ministerial Decrees 31/07/1934 and 22/11/2017.
– Supplied with Test Certificate No. 5127/4113 sub. 247 (26/10/1998 – supplement 21/05/2009).
– Compliant with fire safety regulations, featuring a 110% capacity containment bund.
– Constructed from EN 10025 S235JR carbon steel.

Specifications:
Tank capacity: 4,950 L
Shape: Horizontal cylindrical
Tank Ø × L (mm): 1,800 × 2,080
Containment bund dimensions (mm): 2,440 × 2,110 × 1,100
Containment bund capacity: 5,663 L
Canopy dimensions (mm): 2,380 × 2,810 × 1,250
Total weight (kg): 700
Filling connection: 3″ quick coupling
Vent with flame arrester: 1″1/2
Low-level probe: Included
Lifting eye: Included
Overfill prevention valve: 3″
Low-level switch probe: Included
Mechanical level gauge (dial type): Included
Dispensing unit components: Included
Electrical control panel: Included
Spring-loaded check valve: Included
Shut-off valve: Included
Filter: Included
Dispensing nozzle: Included
Suction hose: 1″

Featured projects

Selected activities representing our
cross-market operational support.

Stimulation Triplex Pump

Sector: Refurbishment and Re-engineering
Country: Italy

Complete refurbishment and re-engineering of a high-pressure triplex pumping unit, with a total overhaul of the engine, pump, and transmission. New DNV 2.7-1 compliant skid, ATEX adaptation for classified zones, and CE-PED certification for offshore applications.

Koomey Unit and Pressure Control for geothermal project

Sector: Geothermal
Country: Netherlands

Supply of Koomey Unit and Pressure Control Equipment, including large-sized Quick Test Subs and Crossovers (13 5/8″ and 12″), for workover and coiled tubing activities on a geothermal well in the Netherlands. The solutions were designed to allow the passage of workover assemblies and jet pumps with an OD up to 9″, ensuring operational continuity, safety, and documentation compliant with project requirements, supporting the development of geothermal energy as a renewable source.

Custom chemical formulations for Production Enhancement

Sector: Production Enhancement – Chemical Supply
Country: Kazakhstan

Joint development and supply of custom-made chemical formulations, in collaboration with the Client, for production enhancement and plant performance optimization applications. The program allowed an improvement in process efficiency and a significant reduction in operating costs.

Supply of 15K PSI Well Control Equipment

Sector: Workover
Country: Turkmenistan

Supply of 15K PSI Well Control Equipment for a client operating in Turkmenistan. The equipment was prepared, tested, and certified in accordance with the operator’s technical requirements for use in a field characterized by complex operating conditions. The technical support provided during alignment and scope definition meetings was crucial for the correct configuration of the solutions.

Coflex Hose for Well Testing activities

Sector: Workover
Country: Turkey

Supply of Coflex Hose for a well testing project in Turkey. Technical specifications were defined in close coordination with the Client to ensure full compliance with the operator’s operational standards and QA/QC procedures. The added value of the intervention was direct field support, with operational verification and technical alignment during installation activities.

Do you want similar support?

Send a request with activity, country, and timelines:
we will verify feasibility and required documentation.